{"id":2422,"date":"2023-03-01T00:00:00","date_gmt":"2023-02-28T13:00:00","guid":{"rendered":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/construction-update-truganina-north-secondary-school\/"},"modified":"2024-08-21T11:10:59","modified_gmt":"2024-08-21T01:10:59","slug":"construction-update-truganina-north-secondary-school","status":"publish","type":"post","link":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/construction-update-truganina-north-secondary-school\/","title":{"rendered":"Construction Update: Truganina North Secondary School"},"content":{"rendered":"<p><span style=\"color: rgb(36, 31, 33); font-family: \"Source Sans Pro\", \"Helvetica Neue\", Helvetica, Arial, sans-serif; font-size: 16px; white-space: pre-wrap;\">Truganina North Secondary School (interim name) is progressing and due to open Term 1, 2024. The school will accommodate 800 students at their senior campus when the first stage of the school is complete. <\/span><\/p>\n<p><\/p>\n<p><span style=\"color: rgb(36, 31, 33); font-family: \"Source Sans Pro\", \"Helvetica Neue\", Helvetica, Arial, sans-serif; font-size: 16px; white-space: pre-wrap;\">Images first appeared here <\/span><a href=\"https:\/\/www.schoolbuildings.vic.gov.au\/truganina-north-secondary-school-interim-name\">https:\/\/www.schoolbuildings.vic.gov.au\/truganina-north-secondary-school-&#8230;<\/a><\/p>\n<p><\/p>\n<p><span style=\"color: rgb(36, 31, 33); font-family: \"Source Sans Pro\", \"Helvetica Neue\", Helvetica, Arial, sans-serif; font-size: 16px; white-space: pre-wrap;\"><img decoding=\"async\" alt=\"\" src=\"https:\/\/westbrookestate.com.au\/sites\/default\/files\/Construction%20update%20Truganina%20North%20Secondary%20School%20%28interim%20name%29%20%281%29.mp4\" \/><img decoding=\"async\" alt=\"\" src=\"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-content\/uploads\/2024\/08\/TruganinaNthSS_SeniorCampus_InterimName_230201_Construction_Overview_6.jpg\" style=\"width: 300px; height: 169px;\" \/><\/span><\/p>\n<p><\/p>\n<p><span style=\"color: rgb(36, 31, 33); font-family: \"Source Sans Pro\", \"Helvetica Neue\", Helvetica, Arial, sans-serif; font-size: 16px; white-space: pre-wrap;\"><img decoding=\"async\" alt=\"\" src=\"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-content\/uploads\/2024\/08\/TruganinaNthSS_SeniorCampus_InterimName_230201_Construction_Overview_3.jpg\" style=\"width: 300px; height: 169px;\" \/><\/span><\/p>\n<p><\/p>\n<p><span style=\"color: rgb(36, 31, 33); font-family: \"Source Sans Pro\", \"Helvetica Neue\", Helvetica, Arial, sans-serif; font-size: 16px; white-space: pre-wrap;\"><img decoding=\"async\" alt=\"\" src=\"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-content\/uploads\/2024\/08\/TruganinaNorthSS_interim_name_Senior_230221_Construction_2.jpg\" style=\"width: 300px; height: 225px;\" \/><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Truganina North Secondary School (interim name) is progressing and due to open Term 1, 2024. The school will accommodate 800&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2423,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-2422","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"acf":[],"_links":{"self":[{"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/posts\/2422","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/comments?post=2422"}],"version-history":[{"count":4,"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/posts\/2422\/revisions"}],"predecessor-version":[{"id":4177,"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/posts\/2422\/revisions\/4177"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/media\/2423"}],"wp:attachment":[{"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/media?parent=2422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/categories?post=2422"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/westbrook\/wp-json\/wp\/v2\/tags?post=2422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}