{"id":7453,"date":"2018-10-03T00:00:00","date_gmt":"2018-10-02T14:00:00","guid":{"rendered":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/property-observer-new-land-released-at-ashbury\/"},"modified":"2018-10-03T00:00:00","modified_gmt":"2018-10-02T14:00:00","slug":"property-observer-new-land-released-at-ashbury","status":"publish","type":"post","link":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/property-observer-new-land-released-at-ashbury\/","title":{"rendered":"Property Observer &#8211; New land released at Ashbury"},"content":{"rendered":"<p>A new land release was launched at the Ashbury Estate development last weekend.<br \/>\nThe Stage 13B was released Saturday, 9 September with a variety of land sizes available.<br \/>\nThe 1,400-lot residential project is in the new Geelong suburb of Armstrong Creek.<br \/>\nThe project is a 10-minute drive from both the Geelong CBD and beaches at Torquay and Barwon Heads.<br \/>\nCurrently, in the area there is 4,000 homes with an expected 13,000 to be built in the next 20 years.<br \/>\nAccording to Australian Bureau of Statistics data, the median age of buyers in Armstrong Creek is 28 years old.<br \/>\nJustin Bridges bought land in Stage 7 and is about to commence building his new home.<br \/>\n\u201cA great location at a great price, I love the strong sense of community at Ashbury,\u201d Bridges said.<br \/>\n\u201cI know that it is going to be the perfect place for my young son to grow up, thanks to all the planned future playgrounds, parks and sporting facilities.<br \/>\n\u201cPlus, I am especially excited by the new State Primary School proposed within the estate which means that he is going to be able to walk to school down the track.\u201d<br \/>\nGreat coverage for Ashbury in the Property Observer, read the article online &#8211;\u00a0https:\/\/www.propertyobserver.com.au\/finding\/residential-investment\/house&#8230;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A new land release was launched at the Ashbury Estate development last weekend. The Stage 13B was released Saturday, 9&#8230;<\/p>\n","protected":false},"author":1,"featured_media":7050,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-7453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"acf":[],"_links":{"self":[{"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/posts\/7453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/comments?post=7453"}],"version-history":[{"count":0,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/posts\/7453\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/media\/7050"}],"wp:attachment":[{"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/media?parent=7453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/categories?post=7453"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/tags?post=7453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}