{"id":7335,"date":"2023-07-01T00:00:00","date_gmt":"2023-06-30T14:00:00","guid":{"rendered":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/ashbury-southern-reserve-update\/"},"modified":"2023-07-01T00:00:00","modified_gmt":"2023-06-30T14:00:00","slug":"ashbury-southern-reserve-update","status":"publish","type":"post","link":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/ashbury-southern-reserve-update\/","title":{"rendered":"Ashbury Southern Reserve Update"},"content":{"rendered":"<p>In great news for families and nature lovers of every age, construction of Ashbury&#8217;s newest park is underway, and on track to open to the public in early 2024!\u00a0<br \/>\nLocated at 85 Ashbury Boulevard, Armstrong Creek, \u200b\u200b\u200bthe new 2.7-hectare southern\u00a0reserve park\u00a0includes a conservation zone and will feature an impressive array of native shrubs and grasses\u00a0including Woolly Grevillia, Native Fuchsia and Cushion Bush among others.\u00a0<br \/>\n\u200b\u200b\u200b\u200bDesigned by landscape architects, SMEC, the new park will feature a range of recreational facilities including a barbeque area with plenty of undercover seating; a fun playground\u00a0replete with swings, trampolines, and a custom-built play unit!<br \/>\nPlus, with a sports court with basketball and netball goals and walking paths, there&#8217;s something to appeal to visitors of every age.Keep an eye out for\u00a0more updates in the coming months.<br \/>\n\u00a0<\/p>\n<p>\u00a0<br \/>\nDisclaimer: Images, measurements and other information are for general illustration purposes only and are not to scale. Actual facilities, amenities, infrastructure, and their configuration are indicative of current or proposed amenity and infrastructure delivery and design, which may be subject to change without notice.\u00a0 Further, these amenities may not be owned or managed by the Developer and outcomes may be subject to delays in implementation or statutory\/development\/planning approvals outside the Developer\u2019s control.\u00a0 Accordingly, the Developer makes no representations on the delivery or timing of any amenities or works shown or featured herein.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In great news for families and nature lovers of every age, construction of Ashbury&#8217;s newest park is underway, and on&#8230;<\/p>\n","protected":false},"author":1,"featured_media":6815,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9],"tags":[],"class_list":["post-7335","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"acf":[],"_links":{"self":[{"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/posts\/7335","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/comments?post=7335"}],"version-history":[{"count":0,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/posts\/7335\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/media\/6815"}],"wp:attachment":[{"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/media?parent=7335"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/categories?post=7335"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/dev.build.optimodesign.com.au\/ashbury2025\/wp-json\/wp\/v2\/tags?post=7335"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}